SSJID Solar Farm Repowering: EPRI Case Study

EPRI. 2026. PV Plant Decommissioning and Repowering Case Study: Robert O. Schulz Solar Farm, South San Joaquin Irrigation District. Product 3002034859. May 2026. 22 pages.

An aging solar farm does not always need a full replacement. EPRI examines how SSJID renewed the Robert O. Schulz Solar Farm through field assessment, equipment reuse, and phased construction.

01. Assess Before Replacing

Failing inverters and aging modules reduced output. Field assessments helped the team decide what to replace, what to retain, and how to sequence the work.

02. Reuse Assets. Phase the Work.

The project reused suitable structures and equipment while replacing legacy technology. NuLife Power Services handled repowering engineering and construction, including execution planning and sequencing. The phased approach limited production losses.

03. More Capacity Within the Same Footprint

EPRI reports a 46% increase in gross DC generating capacity. Expected simple payback is under two years including Inflation Reduction Act incentives, or within three years without them. These are project-specific results, not a forecast for every site.

Read the Full EPRI Case Study

Download the original report for project details, costs, equipment disposition, and lessons learned.

Download PDF · 22 pages

View the publication on EPRI ↗

Request an asset assessment →

This page is a NuLife summary of EPRI’s published research. Report copyright © 2026 Electric Power Research Institute, Inc. All rights reserved. Reference to NuLife in the report does not imply EPRI endorsement. See the original report for assumptions, limitations, and full findings.